undefined

undefined

+
  • 双梁桥式起重机.jpg

Double-girder bridge crane


The double-girder bridge crane is composed of four parts: the bridge frame, the trolley, the traveling mechanism of the large car and the electrical equipment. This product is suitable for workshops, freight yards and warehouses in stations, ports, industrial and mining enterprises and other departments, and is used for lifting, transporting and loading/unloading various materials within the fixed span.

Product classification:

Keywords:

- Structure

It is composed of two parallel main beams, combined with a large vehicle running mechanism, a hoisting trolley and an electrical system, featuring strong stability.

 

- Principle

The large car moves longitudinally along the track, while the small car runs laterally between the two main beams. The lifting mechanism achieves the lifting and lowering of heavy objects through steel wire ropes and hooks.

 

- Features

It has a large lifting capacity (up to hundreds of tons), a long span and a wide range of operations. The double-beam design distributes the load and is suitable for lifting heavy and large objects. The operation is smooth and the safety is high.

 

- Application

It is widely used in fields such as mechanical manufacturing, metallurgy, and ports, undertaking the loading, unloading, handling, and installation of heavy objects like steel and large equipment.

Submit your requirements

Submit

Recommended Products